Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
TSC HLGS Series Mud Gas Seperator (Gas-buster or Poor boy degasser) | HLGS800 / 1000 / 1200| 1.0MPA / 4.0MPA
BrandTSC
Medical Disposable Cap
BrandSHOW LONG
Scribers
BrandENDURA
Grip Tools | DCS-R Series Drill Collar Slip
BrandRUTONG
21pcs. Thread Taps Set
BrandENDURA
Casing Hanger 3000psi, 13-5/8" X 7-5/8"-AA
BrandLIWEN
BFK Series Cementing Spider
BrandSHUANGJIA
VDE Insulated Diagonal Plier
BrandENDURA
2 inch Seamless Line Pipe X60
BrandXINBAOYI
VDE Insulated Bolt Cutter
BrandENDURA
Lifting Cap│ Integral
BrandSHUANGJIA
Liner Gasket, P/N: RS11306.05.004 | RSF-800/ RSF-1000
BrandKERUI
Magnetic Stand
BrandENDURA
Seat-Small Spring P/N: HD100-13 | HM Series Desilter
BrandTSC
03310 SAE 100 R2AT/EN 853 2SN Hose Sleeve
BrandHUBEI SANTONG
Hydrocyclone, Ø250, P/N: HD250 | HD Series Desander
BrandTSC
3-1/2 inch seamless line pipe X42
BrandXINBAOYI
5pcs. Pick Up Tool Kits
BrandENDURA