Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe
Brand YSDLGJ
Certification
Lead Time 30days
Guarantee Period 12months
Source of Supply Hebei
Payment Method T/T L/C
Welded to the end of the pipe or fitted to the outer thread of the end of the pipe to seal the pipe.
Recommendations
Metering Tank
BrandERUI
1/4" Dr.VDE Insulated Socket
BrandENDURA
Power Tong Accessories | Locating Handle, P/N: 01.01.01.00M | ZQ162-50, ZQ203-100
BrandRUSHI
Crude Oil Buffer Tank
BrandERUI
Bumper, P/N: RS78.110.00 | SL450/SL450A
BrandRUSHI
Bolt, P/N: 1149771 |MP-5
BrandKERUI
Spacer Ring I, P/N: RS78.120-09|SL450/SL450A/SL225
BrandRUSHI
Wear-proof disk| LGF-1300 / LGF-1600
BrandKERUI
Bolt, P/N: 1198267 |MP-5
BrandKERUI
Power Tong Accessories | Relief Valve, P/N: YF-B20H3S | ZQ203-100
BrandRUSHI
HJ Series H Safety Joint
BrandSHUANGJIA
Sand Blasting Equipment
BrandANTAI
6.3mm Insulated Screwdriver
BrandENDURA
Nozzle, 50mm | HJM200 Mud Hopper
BrandTSC
Power Tong Accessories | Hand- Reversing Valve, P/N: 34SH-B20H-T | TQ340-35
BrandRUSHI
Bearing Cover, P/N: TS-20619-01, TS-20619-02 | HCP/HCP-S Series Pump Parts
BrandTSC
Cyliner Head Plug, P/N: AH100101050500 |BOMCO F-800/ F-1000
BrandKERUI
High-Pressure One-time Gravel Filling Tool
BrandERUI