3000PSI BB tubing head housing
Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
Oil Seal of Input Shaft, 55x80x10 | Agitator HA-5.5/HA-7.5/HA7.5-2
BrandTSC
3/4" Dr. Extention Bar
BrandENDURA
Replaceable Rubber Pistons|Sizes in inches|With Piston Bore 1-5/8 in and 1-1/2 in Bushing
BrandKERUI
Double Flap Swing Check Valve
BrandCD
1/2 In. L-handle
BrandSHEFFIELD
KCP52 Coalbed Methane Supercharging and Expansion Compressor
BrandKERUI
1/4" Dr. 25l Torx Bits
BrandENDURA
4"NPS Butt Welded Straight Cross
BrandRUNYANG
BZ Mechanical Drilling Jar
BrandSHUANGJIA
3-1/2"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
Upper Impeller Assembly, P/N: HNJ18.5-04 | Agitator HA-18.5
BrandTSC
Medium Plate Clamp
BrandJ&L
Suction Pump Accessories-valve Cover
BrandBAOSHI
25-225THC Tubing Pump
BrandFUQIAO
KS021552-Safety Shoes
BrandKANGSHIELD
1/4"Dr.50l Torx Bits
BrandENDURA
KCP75 Low Pressure Coalbed Methane Supercharging Screw Compressor
BrandKERUI
Rotating Shaft Assembly, P/N: HNJ4-02 | Agitator HA-4
BrandTSC