5000PSI EE Tubing Head Housing
Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
6pc File Set
BrandENDURA
3"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
10Pc Screwdriver Set
BrandSHEFFIELD
2"NPS Butt Welded Straight Cross
BrandYSDLGJ
Hoisting Tools | BJ Type 350ton Elevator/Spider 4-1/2"~13-3/8" |SEB350
BrandRUTONG
Screwdriver Phillips
BrandENDURA
Bow Spring Centralizer
BrandSHANGSHAN
Flat Shackle
BrandJ&L
20-175RHBM Rod Pump
BrandFUQIAO
BOMCO F-500 Mud Pump Fluid End Accessories_Inch
BrandKERUI
TSC HMC Series Mud Cleaner | HMC250x2/100x12, HMC250x3/100x16
BrandTSC
9*12mm Rectangular Open End Fitting
BrandENDURA
KS021552-Safety Shoes
BrandKANGSHIELD
Upper Impeller Assembly, P/N: HNJ18.5-04 | Agitator HA-18.5
BrandTSC
Upper Impeller Assembly, P/N: HNJ5.5-03 | Agitator HA-5.5
BrandTSC
Z331-150 Cup Packer
BrandZHAOXIN
9*12mm Reversible Ratchet Head
BrandENDURA
25-225THC Tubing Pump
BrandFUQIAO