Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
KV152402 Cowhide Work Gloves
BrandKANGSHIELD
Double Legs Spliced Wire Rope Sling
BrandJ&L
Endless Chain Sling
BrandJ&L
JZLG40 Coiled Tubing Weight Indicator
BrandJPIM
SS Ball Valve, 1/2" | HV240/HV1200 Degaser
BrandTSC
Oil Filter Wrench
BrandENDURA
Adjustable Wrench
BrandENDURA
2"NPS 90°Elbow
BrandRUNYANG
HG20613-45# Full Thread Stud-teflon
BrandTB
LM Series Casing Spear
BrandSHUANGJIA
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
90° Socket Welding Elbow
BrandYSDLGJ
Slogging Open Wrench
BrandENDURA
9pcs. Comb Wrench Set
BrandENDURA
Metric System HSS Machine Screwtap M5
BrandSHEFFIELD
DPI10C Pressure Transmitter
BrandBAISSDE
Doubleleg Pressed Steel Wire Rope Sling
BrandJ&L
Makeup and Breakout Tools | Manual Tong Type HT55 W/LG. Lever|3-1/2"~13-3/8"|55000 Ft.Lbs
BrandRUTONG