Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
Cast Steel Lift Check Valve
BrandCD
Diamond File 5*180mm
BrandENDURA
1/4"Dr. Double End Bits
BrandENDURA
Rotating Shaft Assembly, P/N: HNJ4-02 | Agitator HA-4
BrandTSC
Drilling Line∣6*19S-IWRC-IPS-sZ, Lubricated, Uncoated Finish
BrandJ&L
Grade S6 DX Shackle
BrandJ&L
Standard Oil-injected Screw Air Compressor
BrandDENAIR
Cast Steel Lift Check Valve
BrandCD
QYZ Hydraulic Drilling Jar
BrandSHUANGJIA
Upper Impeller Assembly, P/N: HNJ5.5-03 | Agitator HA-5.5
BrandTSC
Urethane Bonded Pistons|Sizes in Millimeters|With Piston Bore 38.1mm
BrandKERUI
20-175RHBM Rod Pump
BrandFUQIAO
Suction pump accessories-pump barrel coupling
BrandPYZS
Double Flap Swing Check Valve
BrandCD
8 Tons Cleaning Sweeper Truck
BrandCLW
7" Tin Snips
BrandSHEFFIELD
Rotating Shaft Assembly, P/N: HNJ7.5-03 | Agitator HA-7.5/HA7.5-2
BrandTSC
Bow Spring Centralizer
BrandSHANGSHAN