Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZL series double drum vertical chain grate boiler pipe steam and hot water boiler adopts quick installation or assembly structure.4~6t/h is the structure of quick-loading water pipe, which leaves the factory after being fully assembled in the factory;6~35t/h is composed of the upper and lower parts, the upper part is the body heating surface, and the lower part is the combustion equipment.
Recommendations
YJS Hydraulic Jar Intensifier
BrandSHUANGJIA
12.5mm Speeder Handle
BrandSHEFFIELD
2"NPS Butt Welded Straight Cross
BrandRUNYANG
Go Through Screwdriver Phillips
BrandENDURA
2000 PSI CC Electric Pump Wellhead
BrandLIWEN
5/16"Dr. 70L Slotted Bits
BrandENDURA
20-125RWBC Rod Pump
BrandFUQIAO
Power Tong | Drill Pipe Power Tong|ZQ216-135II|3-1/2~8-1/2
BrandRUSHI
Bits Handle
BrandENDURA
Full Performance Screw Air Compressor
BrandDENAIR
3000 PSI DD Electric Pump Wellhead
BrandLIWEN
Grip Tools | Insert Used for DC-S, DCS-R And DCS-L Drill Collar Slips
BrandRUTONG
3" NPS Pipe Cap
BrandRUNYANG
Rigid Vertical Bar Centralizer
BrandSHANGSHAN
5000PSI AA PCP Wellhead
BrandLIWEN
Power Tong | Tubing Power Tong|XQ140/12Y|2-7/8~5-1/2
BrandRUSHI
Worm Shaft, P/N: TWPX175-10 | Agitator HA-5.5/HA-7.5/HA7.5-2
BrandTSC
Tubing Subsurface Pump
BrandBAOSHI