steam boiler
Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
The angle tube type gas boiler uses a pipeline system as the skeleton of the entire boiler, and bears the full load of the boiler by itself, so it also becomes a frameless boiler. At the same time, this skeleton also serves as the boiler's down pipe and upper and lower headers. . The boiler drum is externally installed, the hearth is a fully enclosed membrane wall structure, the convection heating surface adopts a flag tube structure, and the angle tube boiler has the advantages of compact structure, low steel consumption, and rapid temperature rise, so it is widely used. The boiler has a bulk structure.
Recommendations
Drilling Line∣6*26WS-IWRC-EEIP-sZ, Lubricated, Uncoated Finish
BrandJ&L
2FZ18-U Double-ram Blowout Preventer
BrandZHONGZHONG
3-1/2"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
4"NPS Butt Welded Straight Cross
BrandRUNYANG
20-175RHBM Rod Pump
BrandFUQIAO
BZ Mechanical Drilling Jar
BrandSHUANGJIA
(Carbon Steel) No Leakage WaferCheck Valve
BrandCD
TSC HMC Series Mud Cleaner | HMC250x2/100x12, HMC250x3/100x16
BrandTSC
Rotating Shaft Assembly, P/N: HNJ7.5-03 | Agitator HA-7.5/HA7.5-2
BrandTSC
9*12mm Reversible Ratchet Head
BrandENDURA
Spinner Handle
BrandENDURA
Bladder Assy, P/N:AK4535020400 |BOMCO F-500/F-800
BrandKERUI
Suction Pump Accessories-plunger Upper Valve Cover
BrandPYZS
3"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
Grade S6 DX Shackle
BrandJ&L
15-106RHBC Rod Pump
BrandFUQIAO
Bow Spring Centralizer
BrandSHANGSHAN
KCP52 Coalbed Methane Supercharging and Expansion Compressor
BrandKERUI