Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
12.5mm Universal Joint
BrandENDURA
32 Pc Tool Set
BrandSHEFFIELD
Suction Pump Accessories-valve Cover
BrandBAOSHI
K344-98 Fracturing Packer
BrandZHAOXIN
25-225THC Tubing Pump
BrandFUQIAO
(Carbon Steel) No Leakage WaferCheck Valve
BrandCD
KS021546-Safety Shoes
BrandKANGSHIELD
Suction Pump Accessories-Fixed Valve Cover
BrandBAOSHI
Running and Retrieving Tool for VR Plug
BrandSHENKAI
Suction Pump Accessories-External Thread Plunger Closed Valve Cover
BrandBAOSHI
BZ Mechanical Drilling Jar
BrandSHUANGJIA
3-1/2"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
QYZ Hydraulic Drilling Jar
BrandSHUANGJIA
1/4"Dr. Double End Bits
BrandENDURA
KS021552-Safety Shoes
BrandKANGSHIELD
Hoisting Tools | BJ Type 350ton Elevator/Spider 4-1/2"~13-3/8" |SEB350
BrandRUTONG
6pc File Set
BrandENDURA
TSC HMC Series Mud Cleaner | HMC250x2/100x12, HMC250x3/100x16
BrandTSC