Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Mud Pump|RS-F800
BrandHRSB
Mud Pump|RS-F1600FTL
BrandHRSB
NPS1 CL600 Flat welding Flange
BrandRUNYANG
Endless Chain Sling
BrandJ&L
8"NPS 90°Elbow
BrandRUNYANG
NPS10 CL300 Blind Flange
BrandRUNYANG
Packing, P/N: SZB-8-12 | HV240/HV1200 Degaser
BrandTSC
10mm Torque Wrench
BrandSHEFFIELD
Copper Core Cross-Linked Polyolefin Insulated Halogen-Free Low-Smoke Flame-Retardant Wire
Branddalu
KV052403 PVC Dipped Gloves
BrandKANGSHIELD
JQHS-50×20X Air Winch
BrandJULING
Normal Level 0.5 Large-Diameter Oval Gear Flowmeter
BrandHENGHE
4pcs. Double Open End Wrench Set
BrandENDURA
3-WEB Valve Assy. |Urethane Insert|API-7
BrandKERUI
Injection Safety Shoes
BrandKANGSHIELD
Butt-welded 90° Elbow
BrandYSDLGJ
16"NPS 90°Elbow
BrandYSDLGJ
4-WEB/X-Arm/Supreme Valve Assy. |Urethane Insert|API-6
BrandKERUI