Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
VDE Insulated Nut Driver Screwdrivers
BrandENDURA
Magnetic Parts Tray
BrandENDURA
2 inch Seamless Line Pipe X52
BrandXINBAOYI
34 inch Helical Submerged Arc Welded Steel Pipe
BrandYULONG
Casing Hanger 3000psi, 13-5/8" X 7-5/8"-AA
BrandLIWEN
Folding Protective Respirator
BrandKANGSHIELD
A Type 160 / 50-200 / 50t Double Beam Hook Gantry Crane
BrandWEIHUA
5pcs. Pick Up Tool Kits
BrandENDURA
Flashboard Assy |HH 3NB1300F / 3NB1600F
BrandKERUI
Back Motor Plate, P/N: X05310065| LW450×1000-N
BrandXBSY
Floodlight Lithium Working Lamp
BrandENDURA
Cable Cutter
BrandENDURA
50pcs. VDE Insulated Screwdrivers Set
BrandENDURA
Liner Gasket, P/N: RS11306.05.004 | RSF-800/ RSF-1000
BrandKERUI
Container Generator Set
BrandEuenon
Oil Seal 4.5"x5.5"x0.5", P/N:AH1001010416 |BOMCO F-800
BrandKERUI
O-Ring, P/N: 1198401 | MP-5
BrandKERUI
Fixing Clip, P/N: AH1001010521,AH33001-05.30 |BOMCO F-800/ F-1000
BrandKERUI