Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Upper/ Lower Impeller Assembly, P/N: HNJ7.5-04, HNJ7.5-07-2 | Agitator HA-7.5/HA7.5-2
BrandTSC
1/2" Dr. Bit Sockets Hex
BrandENDURA
2FZ18-U Double-ram Blowout Preventer
BrandZHONGZHONG
KS021552-Safety Shoes
BrandKANGSHIELD
Cleaning Sweeper Truck
BrandCLW
6pcs. Engineering Drills Set
BrandENDURA
20-106RHBC Rod Pump
BrandFUQIAO
Worm Gear, P/N: TWPX155-8 | Agitator HA-4 Gear Box Parts
BrandTSC
14*18mm Reversible Ratchet Head
BrandENDURA
Rubber Hammer
BrandENDURA
QYZ Hydraulic Drilling Jar
BrandSHUANGJIA
KS021531 Safety Shoes
BrandKANGSHIELD
KCP75 Low Pressure Coalbed Methane Supercharging Screw Compressor
BrandKERUI
9*12mm Reversible Ratchet Head
BrandENDURA
1/4"Dr. Double End Bits
BrandENDURA
Replaceable Urethane Pistons|Sizes in Millimeters|With Piston Bore 38.1mm
BrandKERUI
8pcs. Folding Torx Key Set
BrandENDURA
25-225THC Tubing Pump
BrandFUQIAO