Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
K344-94 Fracturing Packer
BrandZHAOXIN
10" Aviation Tin Snips (Right Elbow)
BrandSHEFFIELD
Side-open Ram BOP
BrandSHENKAI
Multi-Screwdriver
BrandENDURA
13pc. Engineering Drills Set
BrandENDURA
Desulfurizer (Triazines)
BrandDFHG
Worm Shaft, P/N: TWPX175-10 | Agitator HA-5.5/HA-7.5/HA7.5-2
BrandTSC
FH54-35 Annular Blowout Preventer
BrandSHENKAI
Aviation Snips-Left Cut
BrandENDURA
Replaceable Urethane Pistons|Sizes in Millimeters|With Piston Bore 25.4mm
BrandKERUI
KCP76 Pipe Gas Treatment Compressor
BrandKERUI
F48-70 S-shaped Single Ram Blowout Preventer
BrandSHENKAI
Screwdriver Phillips
BrandENDURA
Oil Seal of Input Shaft, 65x95x12 | Agitator HA-4
BrandTSC
5/16"Dr. 70L Slotted Bits
BrandENDURA
Suction Pump Accessories-internal Thread Plunger Connector
BrandPYZS
2000PSI FF Water Injection Wellhead
BrandLIWEN
Half-Round File
BrandENDURA