Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
10" Tin Snips
BrandSHEFFIELD
Rubber & Plastic Handled Screwdriver Slotted
BrandENDURA
RS78.100-12A Stem
BrandRUSHI
Diamond File
BrandENDURA
Round File 10"
BrandENDURA
Petroleum Drilling Grade Xanthan Gum
BrandHAILANCHEM
Oil Seal of Input Shaft, 95x130x12 | Agitator HA-18.5
BrandTSC
Full Performance Screw Air Compressor
BrandDENAIR
3000PSI HH PCP Wellhead
BrandLIWEN
Aviation Snips-Left Cut
BrandENDURA
Power Tong | Drill Pipe Power Tong|ZQ216-135II|3-1/2~8-1/2
BrandRUSHI
Worm Shaft, P/N: TWPX175-10 | Agitator HA-5.5/HA-7.5/HA7.5-2
BrandTSC
Rotating Shaft Assembly, P/N: HNJ5.5-02 | Agitator HA-5.5
BrandTSC
YJS Hydraulic Jar Intensifier
BrandSHUANGJIA
1/4"Dr.50L Phillips Bits
BrandENDURA
Tubing Subsurface Pump
BrandBAOSHI
2" NPS Pipe Cap
BrandYSDLGJ
10" Straight Aviation Tin Snip
BrandSHEFFIELD