Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Diesel Pile Hammer ∣ D180 D260 D300, DELMAG
BrandDELMAG
NPS2 CL300 SW Flange
BrandRUNYANG
Power Tong Accessories | Jaw Assy., Size 5-1/2″, 7″, 9-5/8″, 13-3/8″|TQ340-35
BrandRUSHI
Packing Assembly, RS72.130.00 | SL135/SL170
BrandRUSHI
Shaft, P/N: TS-20612-02-33 | HCP/HCP-S Series Pump Parts
BrandTSC
Gooseneck, P/N: 71.110.00 | DSL-110
BrandRUSHI
Bearing, O.B. (2 Req'd), P/N: TS-648408201S | HCP/HCP-S Series Pump Parts
BrandTSC
PA-4112 Guide Rail Installation Switch Quantity Signal Isolator (Two-in Two-out)
BrandParagon
Gland For Packing Box, P/N:RS78.120-13 |SL450/SL450A
BrandRUSHI
Pumping Unit
BrandZYZJ
NPS2 CL600 SW Flange
BrandYSDLGJ
ADAPTOR
BrandENDURA
Float Valve Core|Model"F"|Model"G"
BrandSHUANGJIA
Movable external thread-type bimetal thermometer
BrandHENGHE
Inspection Mirror
BrandENDURA
Y-60z Pressure Gauge
BrandLANLIANFUJI
Forged Nail Puller
BrandENDURA
JQ-JY Mechanical-hydraulic Shock Absorber
BrandSHUANGJIA