Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
7" Tin Snips
BrandSHEFFIELD
Oil Seal of Input Shaft, 55x80x10 | Agitator HA-5.5/HA-7.5/HA7.5-2
BrandTSC
25-225THC Tubing Pump
BrandFUQIAO
QYZ Hydraulic Drilling Jar
BrandSHUANGJIA
Bladder Assy, P/N:AK4535020400 |BOMCO F-500/F-800
BrandKERUI
12.5mm Universal Joint
BrandENDURA
1/2" Dr. Bit Sockets Hex
BrandENDURA
Suction Pump Accessories-External Thread Plunger Closed Valve Cover
BrandBAOSHI
6-1/2" Double-color Stainless Steel Scissors
BrandSHEFFIELD
1/4" Dr. 25l Torx Bits
BrandENDURA
1/2 In. L-handle
BrandSHEFFIELD
Cast Steel Lift Check Valve
BrandCD
32 Pc Tool Set
BrandSHEFFIELD
Upper/ Lower Impeller Assembly, P/N: HNJ7.5-04, HNJ7.5-07-2 | Agitator HA-7.5/HA7.5-2
BrandTSC
Running and Retrieving Tool for VR Plug
BrandSHENKAI
14*18mm Reversible Ratchet Head
BrandENDURA
Flat Shackle
BrandJ&L
20-175RHBM Rod Pump
BrandFUQIAO