Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Straight Cutting Snips
BrandENDURA
2"NPS Butt Welded Straight Cross
BrandRUNYANG
Grip Tools | Insert Used for DC-S, DCS-R And DCS-L Drill Collar Slips
BrandRUTONG
Aviation Snips-Left Cut
BrandENDURA
Bits Handle
BrandENDURA
Screwdriver Phillips
BrandENDURA
Rotating Shaft Assembly, P/N: HNJ5.5-02 | Agitator HA-5.5
BrandTSC
1"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
20 Tons Cleaning Sweeper Truck
BrandCLW
10" Aviation Tin Snips (Right Elbow)
BrandSHEFFIELD
Power Tong Accessories | Die, P/N: 01.01-27M | ZQ203-100
BrandRUSHI
Hoisting Tools | SLX Series Casing Elevators|150 STON|5-1/2~20 IN
BrandRUTONG
Rigid Vertical Bar Centralizer
BrandSHANGSHAN
F18-105 S-shaped Single Ram Blowout Preventer
BrandSHENKAI
Petroleum Drilling Grade Xanthan Gum
BrandHAILANCHEM
Replaceable Urethane Pistons|Sizes in inches|With Piston Bore 1-1/2 in
BrandKERUI
Towing Belt for Cars
BrandJ&L
10" Tin Snips
BrandSHEFFIELD