Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Packing, P/N: SZB-8-12 | HV240/HV1200 Degaser
BrandTSC
CL Series Fishing Magnet│ Type A│ Type B
BrandSHUANGJIA
8"NPS 90°Elbow
BrandRUNYANG
Mud Pump|RS-F1600HL
BrandHRSB
Oil Filter Wrench
BrandENDURA
Adjustable WrenchH
BrandENDURA
Makeup and Breakout Tools | Manual Tong Type HT135|7-1/2"~12"|135000 Ft.Lbs
BrandRUTONG
Double Box End Wrench
BrandENDURA
KGS0015 High Visibility Rain Suit
BrandKANGSHIELD
Oil Filter Wrench
BrandENDURA
4pcs. Pliers Tool Kit
BrandENDURA
Copper Core Cross-Linked Polyolefin Insulated Halogen-Free Low-Smoke Flame-Retardant Wire
Branddalu
4"NPS 45°Elbow
BrandYSDLGJ
Main Shaft, P/N: HV2400104 | HV240/HV1200 Degaser
BrandTSC
Injection Safety Shoes4
BrandKANGSHIELD
DJFY-5×16 Electric Winch
BrandJULING
1 1/4"NPS 90°Elbow
BrandRUNYANG
4-WEB/X-Arm/Supreme Valve Assy. |Urethane Insert|API-6
BrandKERUI