Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
92 Series Alumina Grinding Ball
BrandJINGANG
High Density High Hardness 75 Series Alumina Millstone
BrandJINGANG
2000PSI BB Water Injection Wellhead
BrandLIWEN
Hand Saw
BrandSHEFFIELD
Casing Hanger 5000psi, 11" X 4-1/2"-DD
BrandLIWEN
Casing Hanger 3000psi, 11" X 7"-EE
BrandLIWEN
Hoisting Tools | “Y” Series Slip Type Casing Elevator|YC Type 75 STON|3-1/2~7 IN
BrandRUTONG
13-3/8 Inch 5000PSI Threaded Casing Head
BrandBAIXIN
Casing Hanger 5000psi, 13-5/8" X 5-1/2"-AA
BrandLIWEN
4” NPS Pipe Cap
BrandYSDLGJ
Casing Hanger 2000psi, 9 X 4 1/2-FF
BrandLIWEN
3000PSI 5-1/8'' CC Christmas Tree
BrandLIWEN
3000PSI 2-9/16'' HH Christmas Tree
BrandLIWEN
Casing Hanger 5000psi, 13-5/8" X 7"-DD
BrandLIWEN
Cold Chisel
BrandENDURA
3000PSI 4-1/16'' AA Christmas Tree
BrandLIWEN
Center Punch
BrandENDURA
15000PSI 2-1/16'' Christmas Tree
BrandLIWEN