Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Aluminum Alloy Angle Square
BrandENDURA
Water-Tanker Fire Truck
BrandYINHE
KV010402 Latex Dipped Gloves
BrandKANGSHIELD
KH010801 V-type Helmet
BrandKANGSHIELD
NPS 1/2 CL300 Blind Flange
BrandYSDLGJ
KV060401 Scratch-resistant Gloves
BrandKANGSHIELD
23-Leaf Feeler Gauge
BrandSHEFFIELD
Zinc Slloy Knife
BrandENDURA
Gas-Hydraulic Hard Seal Ball Valve QT641Y
BrandCD
KG01006 Safety Glasses
BrandKANGSHIELD
Sliding Pad, P/N: HSTJ-02 |HS Shale Shaker
BrandTSC
10pcs. Screwdriver Set
BrandENDURA
NPS1/2 CL600 Flange
BrandRUNYANG
C-160D-173-74Pumping Unit
BrandZYZJ
Double-end Snub Rope
BrandKANGSHIELD
KV010404 Latex Dipped Gloves
BrandKANGSHIELD
C-160D-143-74Pumping Unit
BrandZYZJ
C-320D-213-86Pumping Unit
BrandZYZJ