Brand Yuanda
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Henan
Payment Method T/T L/C
The boiler adopts the quick installation or assembly structure :4 ~ 8t/h is the quick installation water pipe structure, which leaves the factory after being fully assembled in the factory;10 ~ 15t/h is composed of the upper part and the lower part. The upper part is the body heating surface and the lower part is the combustion equipment.Around the front end of the boiler body for arrangement of water-cooled wall connected to the drum bottom connected to the header of the combustion chamber, to absorb the furnace radiant heat, backend arrangement between water drum on intensive convection tube bundle, high temperature flue gas after combustion after secondary return lateral erosion convection heating surface to separate arrangement of economizer, finally into dust catcher by chimneys;The water-tube boiler assembled above 20t/h is composed of front furnace, rear furnace, convection tube bundle, economizer and chain grate, which are assembled into an integral factory.
Recommendations
Grade T8 DX Shackle
BrandJ&L
Piston Nut, P/N: 1133856 |MP-5/MP8/MP10/MP13/MP16
BrandKERUI
RS78.100-12A Stem
BrandRUSHI
20000PSI, 3-1/8 '' Christmas Tree
BrandLIWEN
Worm Shaft, P/N:TWPX120-10 | Agitator HA-2.2 Gear Box Parts
BrandTSC
20000PSI, 4-1/16 '' Christmas Tree
BrandLIWEN
K344-94 Fracturing Packer
BrandZHAOXIN
Bits Handle
BrandENDURA
1"NPS Butt Welded Equal-diameter Tee
BrandYSDLGJ
Oil Seal of Input Shaft, 65x95x12 | Agitator HA-4
BrandTSC
20 Tons Cleaning Sweeper Truck
BrandCLW
10" Straight Aviation Tin Snip
BrandSHEFFIELD
2000 PSI CC Electric Pump Wellhead
BrandLIWEN
KCP76 Pipe Gas Treatment Compressor
BrandKERUI
Screwdriver Phillips
BrandENDURA
2000PSI FF Water Injection Wellhead
BrandLIWEN
Hoisting Tools | Varco Type 500ton Elevator/Spider|SE500 16"~24-1/2"
BrandRUTONG
Pump Accessories-pump Barrel Valve Cover Reducer
BrandBAOSHI