Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZS series boilers are of double-pot tube, vertical type and D-type layout structure, with furnace on the right side, convective tube bundles on the left side and superheater with convective tube bundles.The movable supports at the middle and both ends of the boiler barrel are fixed on the body chassis, and the whole boiler is guaranteed to expand to both ends.
Recommendations
Round Link Fishing Chain
BrandJ&L
Hoisting Tools | DDZ Series Drill Pipe Elevators |DDZ 100 STON|2-3/8~5 IN
BrandRUTONG
Magnetic Positioning Logging Meter
BrandWELL-SUN
Fungicide
BrandDFHG
Bearing, P/N: 4G32836H | RSF-800
BrandKERUI
3000PSI 2-9/16'' DD Christmas Tree
BrandLIWEN
Casing Hanger 2000psi, 11" X 5-1/2"-EE
BrandLIWEN
Casing Hanger 5000psi, 11" X 4-1/2"-DD
BrandLIWEN
Casing Hanger 5000psi, 13-5/8" X 7"-DD
BrandLIWEN
Casing Hanger 3000psi, 11" X 5-HH
BrandLIWEN
Hand Saw
BrandSHEFFIELD
10000PSI Christmas Tree
BrandLIWEN
2000PSI BB Water Injection Wellhead
BrandLIWEN
4” NPS Pipe Cap
BrandYSDLGJ
Casing Hanger 2000psi, 9 X 4 1/2-AA
BrandLIWEN
Hoisting Tools | “Y” Series Slip Type Casing Elevator|YC Type 75 STON|3-1/2~7 IN
BrandRUTONG
Casing Hanger 3000psi, 13-5/8" X 7"-HH
BrandLIWEN
Casing Hanger 5000psi, 13-5/8" X 7"-BB
BrandLIWEN