Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
SZS series boilers are double drums, vertical type, D-type layout structure, the right side is the furnace, the left side is the convection tube bundle, and the superheater is arranged in the convection tube bundle area; it is fixed on the body chassis through the movable supports at the middle and both ends of the lower drum And ensure that the whole boiler expands to both ends. The furnace wall is surrounded by a membrane water wall. The membrane water wall on the left side of the furnace completely seals and separates the furnace and the convection tube bundle. The rear of the convection tube bundle area is a thin staggered structure, and the front is an inline structure. The smoke generated by the furnace combustion The gas enters the burn-out chamber and the convection tube bundle area from the smoke outlet at the end of the furnace, and then turns from the front of the left side of the boiler into the spiral finned tube economizer and condenser, and finally enters the flue duct to be discharged into the atmosphere.
Recommendations
Piston Nut, P/N: 1133856 |MP-5/MP8/MP10/MP13/MP16
BrandKERUI
25-225THM Tubing Pump
BrandFUQIAO
15000PSI 5-1/8 Christmas Tree
BrandLIWEN
5000PSI AA PCP Wellhead
BrandLIWEN
Sector Acoustic Logging Instrument
BrandWELL-SUN
10" Tin Snips
BrandSHEFFIELD
Grip Tools | Insert Used for DC-S, DCS-R And DCS-L Drill Collar Slips
BrandRUTONG
2000 PSI FF Electric Pump Wellhead
BrandLIWEN
13pcs. Engineering Drills Set
BrandENDURA
FS35-70 Drilling Spool
BrandSHENKAI
RS78.100-12A Stem
BrandRUSHI
Round File 10"
BrandENDURA
Hoisting Tools | SLX Series Casing Elevators|150 STON|5-1/2~20 IN
BrandRUTONG
Pump Accessories-pump Barrel Valve Cover Reducer
BrandBAOSHI
Grip Tools | Model E Pneumatic Tubing Spider | 175 STON | 2-3/8~7-5/8 IN
BrandRUTONG
Bits Handle
BrandENDURA
3000PSI HH PCP Wellhead
BrandLIWEN
2"NPS Butt Welded Straight Cross
BrandRUNYANG