Brand ZOZEN
Certification
Lead Time 70days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
WNS series horizontal internal combustion boiler is a boiler shell type three-pass wet back oil/gas boiler. The operation of the boiler is automated. After the fuel is atomized by the burner, the torch formed is filled in the full-waveform furnace and transmits the radiant heat through the furnace wall. This is the first return journey. The high-temperature flue gas generated by the combustion will converge in the recirculation chamber and turn into the second return stroke, that is, the threaded smoke tube bundle area. After convection heat exchange, the temperature of the flue gas will gradually decrease and then reach the front smoke box. Box out of the boiler body enters the economizer and condenser set on the top of the furnace. The three-pass boiler flue gas is diverted from the front smoke box to the third return, that is, the light pipe tube zone, then enters the economizer and condenser through the rear smoke box, and finally flows into The chimney is discharged into the atmosphere.
Recommendations
NPS1 1/2 CL300 Flat Welding Flange
BrandYSDLGJ
Pumping Unit
BrandZYZJ
9pcs. Long Ball Point Hex Key Set
BrandENDURA
Electromotor for Pumping Unit
BrandJINZHOU
10pcs. Long Ball Point Hex Key Set
BrandENDURA
NPS 24 CL900 Flange
BrandRUNYANG
B-40D-89-48Pumping Unit
BrandZYZJ
Pumping Unit
BrandZYZJ
NPS2 1/2 CL150 SW Flange
BrandRUNYANG
Type Rh01 High Tension Round Sling │High Tensile Endless Type
BrandJ&L
NPS 24 CL1500 Flange
BrandRUNYANG
KH010801 V-type Helmet
BrandKANGSHIELD
CBXK Explosion-proof Travel Switch (II B, II C, tD)
BrandCNYA
Aluminum Alloy Angle Square
BrandENDURA
Shale Shaker Screens Fit DERRICK 600 Series Shaker|Pyramid Screen (PMD)|API 20~API 200
BrandKERUI
CYJY14-4.8-73HF/C Pumping Unit
BrandZYZJ
NPS2 1/2 CL300 Blind Flange
BrandRUNYANG
Water-Tanker Fire Truck
BrandYINHE