10000PSI DD Tubing Head Housing
Brand LIWEN
Certification
Lead Time 90days
Guarantee Period 12months
Source of Supply Jiangsu
Payment Method T/T L/C
Function and use:
1. The tubing head housing is mainly composed of the tubing head body, tubing hanger, side outlet valve, sealing ring and other parts. The structure can be selected according to the needs of single wing, double wing structure.
2. Hangers generally choose single tube, double tube and other structural forms.
3. Plate valve can choose PFF, FC, FL, FLS and other structural forms.
4. All pressure gauges are aseismic.
Recommendations
Mud Pump|RS-F1600HL
BrandHRSB
1"NPS 45°Elbow
BrandRUNYANG
4pcs. Double Open End Wrench Set
BrandENDURA
Adjustable Wrench
BrandENDURA
Main Shaft, P/N: HV2400104 | HV240/HV1200 Degaser
BrandTSC
6"NPS 45°Elbow
BrandYSDLGJ
JQHS-50×20X Air Winch
BrandJULING
NPS2 CL600 Flat welding Flange
BrandRUNYANG
Pumping Unit
BrandHENGTAIFENG
SS Ball Valve, 1/2" | HV240/HV1200 Degaser
BrandTSC
3/4" Dr. Socket Set
BrandENDURA
Shale Shaker Screen Fits Kem-Tron KTL 28 shaker| Metal Frame|API 20~API 325
BrandKERUI
12"NPS 45°Elbow
BrandYSDLGJ
16"NPS 45°Elbow
BrandRUNYANG
Pony Rod
BrandJITONG
Nominal Pressure Level Cast Steel Gate Valve
BrandCD
Doubleleg Pressed Steel Wire Rope Sling
BrandJ&L
100% Cotton Flame Retardant Coverall
BrandXINDAO